Highway Department |
| |
| The Highway Department operates on an annual budget appropriated by
the voters at Town Meeting in March. All operations and maintenance are
funded through the annual budget. Highway responsibilities include road
maintenance, bridge repair, road reconstruction, winter maintenance and
work for other Town departments. Below is a list of personnel currently
working for the Highway Department. |
| |
Full Time Personnel:
Edward G. Thayer
Director
Larry Gaskell
Foreman
Robert Crane II
Maintenance Mechanic
Brian Moser Equipment Operator
Part Time Personnel:
Jim Berry, Gary Crane, Robbie Ostertag |
| |
|
Projects completed by the Highway
Department |
|
The Washington DPW crew is a highly
skilled group with experience in road construction, masonry, heavy
equipment operation, paving, hydraulics, landscaping and so much more.
The pictures linked below represent some of the projects they have
completed in the Town of Washington. By doing the projects for the
Town and School they have saved thousands of dollars that the taxpayers
would have had to pay private contractors to do these projects. |
|
Washington Drive/Freezeland Pond Culvert Replacement
(October 2011) |
|
Washington Elementary School secondary
access road project (summer 2010) |
| Washington Elementary School/Camp Morgan Lodge Fire
Cistern project |
|
Washington Dr. culvert slip lining
project (fall 2009) |
|
|
|
|